Friday, 20 June 2025

Wash basin

I decided on the final location of the wash basin with its own local water supply and waste water storage. This wold be sufficient for a quick hand wash. Is no drinking water, because I did put disinfectant in which keeps the water "pure" for 6 months. 


I affixed the upright waste water container with three slide-in brackets so it is easily to take out but stays firmly in place during operation and driving. 

Thursday, 19 June 2025

Bathroom floor

Last yer I had bought a set of floor panels, and now I decided to put them in. One package was just enough for covering the open area in the bathroom and in the room section at its entrance.

I did only click the panels together, no attachment to the floor. They are swimming now on the carpet floor. Only at the front side I placed a transition cover, which I attached firmly to the floor. That should keep the panels in place.





 Looks not too bad!

Tuesday, 10 June 2025

Trailer

I had gotten the trailer already back on October 2024, but had not yet set up its cover. Now was the time to do this. The trailer sits in the garage and is currently used to store a few things.




It still has its drawbar folded underneath, I would need someone to help me getting it out. Therefore I did leave the wooden protective structure still attached to the back, because I would need to lift the trailer up to unfold the drawbar out.







Will fully make the trailer operable some time later.